Phoventus was responsible for evaluating the feasibility of a BESS project in California, USA, with a capacity of 200 MWac / 200 MW/h
Phoventus provided a report including a layout for the battery storage and substation in the area of interest to ensure enough space for the proposed BESS facility and associated substations.
Furthermore, Phoventus conducted a desktop analysis of the project area’s civil constraints, including detailed Hydrology, and provided a map outlining the identified site constraints. In addition, Phoventus performed a desktop geotechnical review using publicly available sources of information to assess the potential for various geological features that may impact the development and construction of the proposed project.